Earlier than ever before, we’re delighted to bring you the timetable for Morzine’s free shuttle network this winter season.
The busses will begin the season with a reduced service on Friday 12th December, to coincide with the opening of the Winter 26 season in Avoriaz.
The full bus service begins on Saturday 20th December 2025 and runs until Sunday 6th April 2026.
At the end of the winter season, from Monday 7th April until 19th April, the reduced service linking Morzine with Les Prodains and Avoriaz once again comes into operation.
The Full Bus Service
Line A (Avoriaz) : connects Le Pléney to the Prodains cable car, serving all stops located on the Putheys and Ardoisières road.
Line U (Urban) : makes a loop in the centre of Morzine. Departure from Pléney, passing through the Savoie and Pied de la Plagne roundabouts, return via the Tourist Office.
Line N (Nyon) : serves the Nyon cable car.
Line E (Erigné) : starts from Pléney and joins the Manche valley, up to the Mines d’Or Expérience.
Line D (Udrezants) : serves the Bois Venants road and the hamlet of Udrezants.
Line C (La Croix – Le Rocher) : cross line linking Le Rocher to La Croix, via the roundabouts of La Coutettaz and Les Meuniers.

The Reduced Bus Service
Line AU : combines lines A and U.
Route: Pléney – Pied de la Plagne – Medical center – Tourist office – Town hall – Pont des Meuniers – Prodains – return to Pléney.
Line D : maintained with a frequency adapted to the number of passengers.
Line E : maintained until April 12 with a frequency adapted to the number of passengers.


